Paddleworth reservoir new build project

Paddleworth reservoir new build project

Paddleworth reservoir new build project

Pipes are primed with the Premcote™ Primer before the tape is administered

The pre-prepared pipes are stockpiled for later usage

The void between the concrete ring and newly laid concrete is filled with Premband™

Premier™ Ultraseal RT Tape applied to the tank base as part of the Steelcoat™ Tank Base Protection System

The finished Steelcoat™ Tank Base Protection System

The finished Steelcoat™ Tank Base Protection System

Strumpshaw Reservoir Refurbishment Project

Strumpshaw Reservoir Refurbishment Project

Strumpshaw Reservoir Refurbishment Project

Prempaste™ is applied to the oil pipelines

Premtape™ Temperate is wrapped spirally around the pipes

Premier™ PVC Self-Adhesive Tape provides the final layer of protection for the pipeline

Wrapping of the vertical section of the pipe

The completed pipework wrapped with the Premcote 1000R™ Tape System