
Workers on site beginning application of the Premtape™ Tropical System

Profiling with Premier™ Moulding Compound

Overwrapping the valve with Premtape™ Tropical after application of Premier™ Moulding Compound

The finished Premier system

After cleaning, the coupling is primed with Premcote Primer

Premier Joint Moulding putty used to smooth profiles

A circumferential wrap of Premcote 1500™ Tape completes the protection

Pre-wrapped pipes ready for installation

Premcote 150™ Tape during application

Pre-wrapped pipes ready for installation

Pipes are primed with the Premcote™ Primer before the tape is administered

The pre-prepared pipes are stockpiled for later usage

The pipes are laid in trenches before being buried

Premcote 1500™ Tape System applied to pipework at the Civardi Factory

A Premier Coatings Ltd Wrapping Machine was used for this project in order to obtain the perfect distribution of tape on each pipe that was to be wrapped

The stockpile of pipes that have been pre-wrapped will be buried on site at a later date, with further corrosion prevention work taking place on site in 2017

After gentle excavation, some mechanical defects were revealed

Close up of the damaged, original system

Close up of the damaged, original system

Surface of the tie rod is prepped, prior to application of the Premcote 150R System

Surface of the tie rod is prepped, prior to application of the Premcote 150R System

Surface of the tie rod is prepped, prior to application of the Premcote 150R System

Premcote Primer is applied to the tie rod

Premcote 150R Tape is spirally applied to the tie rod

Premcote 150R Tape is spirally applied to the tie rod

Premier PVC Self-Adhesive Tape 200 is spirally wrapped over the Premcote 150R Tape

The finished system