
Premcote™ Primer is applied to the length of the pipe before a spiral wrap of Premcote 101™ Tape.

Much of the pipework is pre-wrapped and stockpiled ready for usage

The main contractor on site was Unicons Construction Co. Ltd.

The Premcote 101™ Tape System

The Premcote™ Primer can just be seen on the right hand side of the image, ready for the continuation of the Premcote 101™ Tape spiral wrap on the pipe

Once wrapped, the pipes are ready to be buried

Rushden Reservoir Refurbishment Program

Rushden Reservoir Refurbishment Program

Premcote™ Primer is applied before the wrapping of the pipe

A circumferential wrap is used with a 55% overlap to create an effective seal

Many pipes are stockpiled ready for coating and wrapping

The Premcote 101™ Tape System during application

Stockpiles of pipes with Premcote 101™ Tape applied

The pipe is primed using the Premcote™ Primer

The Premcote 101™ Tape System applied to the pipework.

Once wrapped, the pipework is then placed in the ground and connected to the sprinkler system

Once wrapped, the pipework is then placed in the ground and connected to the sprinkler system.