CASE STUDY
Evergreen Sprinkler System Proteced by Premcote 101™ Tape System
Buried Coatings
Project Data
Location | Binh Duong Province, Vietnam |
Agent | Minh Phuc, Vietnam |
Client | Evergreen Vietnam Industrial Co. Ltd. |
Consultant | Gherzi Textil Organisation |
Contractor | Unicons Construction Co. Ltd. |
Products | Premcote™ Primer and Premcote 101™ Tape |
Date | May 2018 |
Project Details
Minh Phuc, an approved distributor for Premier Coatings’ products in Vietnam, specified a Premcote system for the protection of sprinkler system pipelines at the Evergreen Spinning Factory in Binh Duong Province.
The system is comprised of a light-duty HDPE tape coated with a bitumen rubber adhesive and is used for the protection of buried or immersed pipes and fittings from corrosion. When the Premcote 101™ Tape is paired with the Premcote™ Primer, the greatest level of adhesion to the pipework is encouraged and helps to create an air-tight seal along the length of the pipe. The project was completed in May 2018.
![Premcote™ Primer is applied to the length of the pipe before a spiral wrap of Premcote 101™ Tape.](https://www.premiercoatings.com/wp-content/uploads/2021/03/Untitled-4-4.png)
Premcote™ Primer is applied to the length of the pipe before a spiral wrap of Premcote 101™ Tape.
![Pipework is pre-wrapped and stockpiled ready for installation](https://www.premiercoatings.com/wp-content/uploads/2021/03/Untitled-2-5.png)
Much of the pipework is pre-wrapped and stockpiled ready for usage
![The main contractor on site was Unicons Construction Co. Ltd.](https://www.premiercoatings.com/wp-content/uploads/2021/03/Untitled-3-5.png)
The main contractor on site was Unicons Construction Co. Ltd.
![Premcote™ Primer is applied to the length of the pipe before a spiral wrap of Premcote 101™ Tape.](https://www.premiercoatings.com/wp-content/uploads/2021/03/Untitled-4-4.png)
Premcote™ Primer is applied to the length of the pipe before a spiral wrap of Premcote 101™ Tape.
![Pipework is pre-wrapped and stockpiled ready for installation](https://www.premiercoatings.com/wp-content/uploads/2021/03/Untitled-2-5.png)
Much of the pipework is pre-wrapped and stockpiled ready for usage
![The main contractor on site was Unicons Construction Co. Ltd.](https://www.premiercoatings.com/wp-content/uploads/2021/03/Untitled-3-5.png)